0. Introduction

   Adding "Resource reservation" and "Backfilling" capabilities to 
   the Grid Engine 6.0 scheduler is a first step towards a looking 
   ahead scheduler. For the sake of orientation it is helpful to 
   delimit the terms "resource reservation" and "backfilling" term 
   from other terms occasionally used to circumscribe looking ahead 
   scheduler capabilities in a less specific fashion:

   Resource Reservation 
      A job-specific reservation created by the scheduler for pending 
      jobs. During the reservation the resources are blocked for lower 
      priority jobs.

   Backfilling
      The process of starting jobs of the job priority list despite of 
      higher priority pending jobs that might own a future reservation 
      with the same resource. Thus backfilling has a meaning only in the 
      context of Resource Reservation or Advance Reservation.

   Advance Reservation
      A reservation (possibly independent of a particular job) that can 
      be requested by a user or administrator and gets created by the 
      scheduler. The reservation causes the associated resources be blocked
      for other jobs.

   Preemption
      The process of interrupting job executions in order to free resources
      for particular jobs.

   See under 'Discussion' below for more details on Resource Reservation 
   and Backfilling as implemented with Grid Engine 6.0.

1. Acknowledgements

   I gratefully acknowledge useful conversations and input in other 
   forms with Lev Markov, Fritz Ferstl, Martin Berger and others.

2. Discussion

   The 6.0 resource reservation and backfilling capabilities considers 
   built-in/user defined consumable resources associated with the cluster 
   (aka global host), a particular host and a particular queue instance. 
   For considering parallel jobs in a similar fashion the limited slot 
   amount of parallel environments is also considered with reservation and 
   backfilling. 

   a) Resource Reservation 

   Resource reservation can be used to guarantee resources are dedicated 
   to jobs in jobs priority order. A good example which helps to comprehend 
   the problem solved with resource reservaiton/backfilling is the so-called 
   "large parallel job starvation problem". In this scenario there is one 
   high priority pending job (possibly parallel) A that requires a larger quota 
   of a particular resource and a stream of smaller and lower priority jobs B(i) 
   requiring a smaller quota of the same resource.
 
   Without resource reservation an assignment for A can not be guaranteed
   assumed the stream of B(i) jobs does not stop - even if job A actually
   has higher priority than the B(i) jobs:

        A      
        |                     
    +---+----+--------+--------+--------+--------+--------+   +----------+
    |  B(0)  | B(2)   | B(4)   | B(6)   | B(8)   | B(10)  |   |          |
    +---+----+---+----+---+----+---+----+---+----+---+----+---+    A     |
        | B(1)   | B(3)   | B(5)   | B(7)   | B(9)   | B(11)  |          |
        +--------+--------+--------+--------+--------+--------+----------+-->
        
    
   With resource reservation job A gets a reservation that blocks lower 
   priority B(i) jobs and thus guarantees resources will be available for
   A as soon as possible:

        A
        |                     
    +---+----+----------+--------+
    |  B(0)  |          |  B(2)  |   ...
    +---+----+    A     +--------+--------+
        |    |          |  B(1)  |  B(3)  |  ...
        +----+----------+--------+--------+------------------------------->
       
   b) Backfilling

   Backfilling can allow utilization of resources that are blocked due to 
   a reservation by jobs of lower priority. Backfilling can take place only 
   if there is a runnable job with a prospective runtime small enough to allow 
   the blocked resource be used without endangering the reservation of a job
   with high priority. In the example above a low priority job C of very short 
   duration could be started prior to job A due to backfilling.

        A
        |                     
    +---+----+----------+--------+
    |  B(0)  |          |  B(2)  |   ...
    +---+---++    A     +--------+--------+
        | C ||          |  B(1)  |  B(3)  |  ...
        +---++----------+--------+--------+------------------------------->
       
   The benefit of backfilling is an improved resource utilization.
   
   c) Tuning considerations

   Since reservation scheduling requires the scheduler to look ahead Grid 
   Engine scheduler will be more performance consuming in reservation mode 
   than in non-reservation mode. In smaller clusters the additional effort is 
   certainly negligible as long as there are only a few pending jobs. With a 
   growing cluster size however and in particular with a growing number of 
   pending jobs the additional effort will be sensible. The key with tuning 
   resource reservation is to delimit the overall number that are made during 
   a scheduling interval. 

   To accomplish this two means are provided: 

   (1) For limiting the absolute number of reservations made during a 
       schedule interval the 'max_reservation' parameters in the scheduler 
       configuration can be used by the Grid Engine administrator. E.g. when 
       max reservation is set to 20 not more than 20 reservations are made 
       within a scheduling interval and as a result the additional effort for 
       reservation scheduling is limited accordingly.
       
   (2) The -R y|n submit option allows restriction of reservation scheduling 
       only to those jobs that actually are critical. In the examples above 
       there is no need to schedule B(i) job reservations just for the sake of 
       guaranteeing the job A resource assignment. The only job that needs to 
       be submitted using -R y is job A. This means all B(i) jobs can be 
       submitted with the -R n (default) without actually endangering the 
       reservation for A.

   d) Monitoring 

   The discussion about tuning indicates it can be useful for administrators
   gain a certain degree of understanding on how schedulers decisions are 
   actually influenced by resource reservation. For this purpose the scheduler 
   configuration param setting MONITOR can be used. This causes additional 
   information be provided in the 'schedule' file kept in the Grid Engines 
   common directory.

   The following example shortly introduces scheduler monitoring. Assume the
   following sequence of jobs 

      qsub -N L4_RR -R y -l h_rt=30,license=4 -p 100  $SGE_ROOT/examples/jobs/sleeper.sh 20
      qsub -N L5_RR -R y -l h_rt=30,license=5         $SGE_ROOT/examples/jobs/sleeper.sh 20
      qsub -N L1_RR -R y -l h_rt=31,license=1         $SGE_ROOT/examples/jobs/sleeper.sh 20

   be submitted into a cluster with the global 'license' consumable resource be 
   limited to a number of 5 licenses. Due to the use of default priority settings 
   in the scheduler configuration

        weight_priority                   1.000000
        weight_urgency                    0.100000
        weight_ticket                     0.010000

   it is ensured the -p priority of the L4_RR job overwhelms the license based 
   urgency finally resulting in a priorization such as 

      job-ID  prior   name 
      ---------------------
         3127 1.08000 L4_RR
         3128 0.10500 L5_RR
         3129 0.00500 L1_RR

   in this case traces of those jobs can be found in the 'schedule' file for
   6 schedule intervals

      ::::::::
      3127:1:STARTING:1077903416:30:G:global:license:4.000000
      3127:1:STARTING:1077903416:30:Q:all.q@carc:slots:1.000000
      3128:1:RESERVING:1077903446:30:G:global:license:5.000000
      3128:1:RESERVING:1077903446:30:Q:all.q@bilbur:slots:1.000000
      3129:1:RESERVING:1077903476:31:G:global:license:1.000000
      3129:1:RESERVING:1077903476:31:Q:all.q@es-ergb01-01:slots:1.000000
      ::::::::
      3127:1:RUNNING:1077903416:30:G:global:license:4.000000
      3127:1:RUNNING:1077903416:30:Q:all.q@carc:slots:1.000000
      3128:1:RESERVING:1077903446:30:G:global:license:5.000000
      3128:1:RESERVING:1077903446:30:Q:all.q@es-ergb01-01:slots:1.000000
      3129:1:RESERVING:1077903476:31:G:global:license:1.000000
      3129:1:RESERVING:1077903476:31:Q:all.q@es-ergb01-01:slots:1.000000
      ::::::::
      3128:1:STARTING:1077903448:30:G:global:license:5.000000
      3128:1:STARTING:1077903448:30:Q:all.q@carc:slots:1.000000
      3129:1:RESERVING:1077903478:31:G:global:license:1.000000
      3129:1:RESERVING:1077903478:31:Q:all.q@bilbur:slots:1.000000
      ::::::::
      3128:1:RUNNING:1077903448:30:G:global:license:5.000000
      3128:1:RUNNING:1077903448:30:Q:all.q@carc:slots:1.000000
      3129:1:RESERVING:1077903478:31:G:global:license:1.000000
      3129:1:RESERVING:1077903478:31:Q:all.q@es-ergb01-01:slots:1.000000
      ::::::::
      3129:1:STARTING:1077903480:31:G:global:license:1.000000
      3129:1:STARTING:1077903480:31:Q:all.q@carc:slots:1.000000
      ::::::::
      3129:1:RUNNING:1077903480:31:G:global:license:1.000000
      3129:1:RUNNING:1077903480:31:Q:all.q@carc:slots:1.000000
      ::::::::

   each section shows for a schedule interval all resource utilizations 
   that were taken into account. The 'RUNNING' entries show utilizations
   of jobs that already were running at the begin of the interval, 
   'STARTING' entries denote immediate utilizations that were decided 
   within the interval and 'RESERVING' entries show utilizations that
   are planned for the future i.e. reservations. 

   The format of the schedule file is

     <jobid>:         The jobs id.
     <taskid>:        The array task id or 1 in case of non-array jobs.
     <state>:         One of RUNNING/SUSPENDED/MIGRATING/STARTING/RESERVING.
     <start_time>:    Start time in seconds after 1.1.1970.
     <duration>:      Assumed job duration in seconds.
     <level_char>:    One of {P,G,H;Q} standing for {PE,Global,Host,Queue}.
     <object_name>:   The name of the PE/global/host/queue.
     <resource_name>: The name of the consumable resource.
     <utilization>    The resource utilization debited for the job.

   A line "::::::::" marks the begin of a new schedule interval. 

   Please note this file is not truncated. Make sure the monitoring
   is switched off in case you have no automated procedure setup that
   truncates the 'schedule' file.
   
3. Changes with command line interface and configuration file formats

   The change as seen from the end users perspective is a improved 
   behaviour of the "-pe parallel_environment range" submit option 
   and a new submit switch "-R y|n" with the commands

   qsub(1)
   qrsh(1)
   qsh(1)
   qlogin(1)
   qalter(1)

   Old behaviour:

   <     -pe parallel_environment n[-[m]]|[-]m,...
   <
   <          You can specify the PE  name   by  using  the  wildcard
   <          character  "*",  thus the request "pvm*" will match any
   <          parallel environment with  a  name  starting  with  the
   <          string "pvm".
   <          The range specification is a list of range  expressions
   <          of the form n-m (n as well as m being positive non-zero
   <          integer numbers), where m is an abbreviation  for  m-m,
   <          -m  is  a  short form for 1-m and n- is an abbreviation
   <          for n-infinity. The range specification is processed as
   <          follows:  The  largest  number  of  queues requested is
   <          checked first. If enough queues meeting  the  specified
   <          attribute  list  are  available, all are allocated. The
   <          next smaller number of queues is checked  next  and  so
   <          forth.

   New behaviour:

   >     -pe parallel_environment n[-[m]]|[-]m,...
   >
   >          You can specify the PE  name   by  using  the  wildcard
   >          character  "*",  thus the request "pvm*" will match any
   >          parallel environment with  a  name  starting  with  the
   >          string "pvm".
   >          The range specification is a list of range  expressions
   >          of the form n-m (n as well as m being positive non-zero
   >          integer numbers), where m is an abbreviation  for  m-m,
   >          -m  is  a  short form for 1-m and n- is an abbreviation
   >          for n-infinity. When a range specification covers  mul-
   >          tiple  slot  numbers all enlisted slot numbers are con-
   >          sidered valid assignments for the job and largest  pos-
   >          sible  assignment  is  chosen for the job. Similarly in
   >          case multiple parallel environments match the specified
   >          PE  name and the range specification covers more than a
   >          slot number the largest possible  parallel  environment
   >          assignment is chosen.
   >

   New switch:

   >
   >     -R y|n
   >          Available for qsub, qrsh, qsh, qlogin and qalter.
   >
   >          Indicates whether a reservation for this job should  be
   >          done. Reservation is never done for immediate jobs sub-
   >          mitted  using  'yes'  with  -now  option.  Please  note
   >          irrespective of the reservation request job reservation
   >          might   be   disabled    using    max_reservation    in
   >          sched_conf(5)  and  might  be limited only to a certain
   >          number of high priority jobs.
   >
   >          By default jobs are submitted with -R n option.
   >

   From the administrators point of view two new scheduler configuration
   parameters were added to sched_conf(5) 

   >  max_reservation
   >     The  maximum  number  of  reservations  scheduled  within  a
   >     schedule  interval.  When  a runnable job can not be started
   >     due  to  a  shortage  of  resources  a  reservation  can  be
   >     scheduled   instead.  A  reservation  can  cover  consumable
   >     resources with the global host, any execution host  and  any
   >     queue.  For  parallel  jobs  reservations  are done also for
   >     slots resource as specified in sge_pe(5).   As  job  runtime
   >     the  maximum  of  the  time specified with -l h_rt=... or -l
   >     s_rt=... is assumed. For jobs that have neither of them  the
   >     default_duration  is  assumed.  Reservations prevent jobs of
   >     lower priority as specified in sge_priority(5) from  utiliz-
   >     ing the reserved resource quota during the while of reserva-
   >     tion. Jobs of lower priority are allowed  to  utilize  those
   >     reserved  resources  only  if  their  prospective job end is
   >     before the start of the reservation (backfilling).  Reserva-
   >     tion  is  done  only  for  non-immediate jobs (-now no) that
   >     request reservation (-R y). If max_reservation is set to "0"
   >     no job reservation is done.
   >
   >     Note, that reservation scheduling can be performance consum-
   >     ing  and  hence  reservation  scheduling  is switched off by
   >     default. Since reservation scheduling  performance  consump-
   >     tion is known to grow with the number of pending jobs use of
   >     -R y option is recommended  only  for  those  jobs  actually
   >     queuing   for   bottleneck   resources.  Together  with  the
   >     max_reservation parameter this technique can be used to nar-
   >     row down performance impacts.
   >
   >  default_duration
   >     When job  reservation  is  enabled  through  max_reservation
   >     sched_conf(5)  parameter  the default duration is assumed as
   >     runtime for  jobs  that  have  neiter  -l  h_rt=...  nor  -l
   >     s_rt=...  specified.  In  contrast to a h_rt/s_rt time limit
   >     the default_duration is not enforced.
   >
 
   another parameter was added to scheduler configuration sched_conf(5) 
   to allow for monitoring resource reservation:

   >   params
   >      This is foreseen for passing additional  parameters  to  the
   >      Sun Grid Engine scheduler. The following values are recognized
   >      currently:
   > 
   >      MONITOR
   >           If set, the  scheduler  records  information  for  each
   >           scheduling  run  allowing  to  reproduce  job resources
   >           utilization           in            the            file
   >           $SGE_ROOT/<cell>/common/schedule.
   > 

   yet another parameter was added to scheduler configuration 
   sched_conf(5) to allow for modeling difference between net and gross
   job runtimes:

   >      DURATION_OFFSET
   >           If set overrides the default  of  60  seconds  that  is
   >           assumed  as  offset by N1GE scheduler when plan-
   >           ning resource utilization  as  delta  between  net  job
   >           runtimes  and  gross time until resources are available
   >           again. Jobs net runtime as specified with  -l  h_rt=...
   >           or  -l  s_rt=... or default_duration always differ from
   >           jobs gross runtime  due  to  delays  before  and  after
   >           actual job start. Amongst these delays before job start
   >           is the time until the end of a  schedule_interval,  the
   >           time  it takes to deliver a job to sge_execd(8) and the
   >           delays prolog in  queue_conf(5)  ,  start_proc_args  in
   >           sge_pe(5)   and  starter_method  in  queue_conf(5)  may
   >           effectuate.  The  delays  after  a  jobs   actual   run
   >           comprises  delays  due  to  a  forced  job  termination
   >           (notify, terminate_method or checkpointing),  procedure
   >           runs  after  acutal job finished such as stop_proc_args
   >           in sge_pe(5) or epilog in queue_conf(5) and  the  delay
   >           until a new schedule_interval.
   >           If the offset is too  low  resource  reservations  (see
   >           max_reservation) can be delayed repeatedly due to a too
   >           optistic job circulation time.

4. Implementation

   For the reservation scheduling major reconstructions in scheduling code
   were made. The new algorithm consists of parts that can be used both for 
   sequential and parallel jobs and other parts where handling of sequential
   and parallel jobs differs. Important steps of the algorithm with all parts
   are summarized at large:

   a) Common part of the algorithm that is used both for sequential and 
      parallel jobs
   
      * jobs are processed in priority order to find suited assignments
        (dispatch_jobs()) 

      * if possible we try to make an assignment to start the job immediately
        otherwise a reservation is made afterwards (select_assign_debit())

      past that stage the algorithm splits for sequential and parallel jobs.

   b) Parts of the algorithm that are used for sequential jobs only 
   
      * for sequential job assignments all the earliest job start time
        is determined with each queue instance and the earliest one gets 
        chosen. Secondary criterion for queue selection minimizing jobs soft 
        requests (sge_sequential_assignment())

      * for determining earliest start time per queue at first the earliest 
        start time due to cluster-wide (=global) resource availability is 
        determined, then for each queue instance the earliest start time due 
        to host resource availability and due to queue instance resource 
        availability is determined (sequential_tag_queues_suitable4job()) 

      * for sequential jobs determining the earliest start time due to resource 
        availability is done by ensuring various constraints are fulfulled and 
        then determining earliest start time with resources of a resource 
        container are fulfilled (sequential_queue_time(), 
        sequential_global_time(), sequential_host_time())

      * the earliest start time due to resources of a resource container is the 
        maximum of the earliest start times for all resources comprised by the 
        resource container that requested by a job (rc_time_by_slots())

      * the earliest start time due to availability of a resource is determined 
        by ensuring non-consumable resource requests are fulfilled or by finding
        the earliest time utilization of a consumable resource is below the 
        threshold required for the request (ri_time_by_slots())

      * the earliest time a utilization is below a threshold is determined by
        searching backwards in resource utilization diagrams (utilization_below())
   
   c) Parts of the algorithzm that are used for parallel jobs only 

      * for parallel job assignments all the earliest job start time
        of all parallel environments matching the parallel environment request
        is determined by determining the earliest start time with each eligable
        parallel environment. The earliest parallel environment is chosen. 
        Afterwards for the chosen parallel environment assignment the slot amount 
        is maximized in case of a slot range request 
        (sge_select_parallel_environment())

      * the earliest job start time for a parallel environment is determined
        by iterating through all times where resource utilization within the 
        schedule actually changes concerning the consumable resources requested 
        by the job and checking whether resources would be sufficient for the 
        job at that particular time. As an optimization for the time iteration 
        a queue end time iterator (QETI) is used (parallel_reservation_max_time_slots()) 

      * checking whether resources would be sufficient at a particular time with
        a parallel environment is done by checking at first whether the 'slot' 
        resource of the parallel environment is sufficient and then whether remaining
        job resource requests can be fulfilled (parallel_assignment()) 

      * checking whether remaining resources meet the request of the parallel job 
        at a particular time is done by checking whether cluster-wide (=global) 
        resources are sufficient and whether the slots available on all eligable 
        hosts together(!) are sufficient for the parallel job
        (parallel_tag_queues_suitable4job())

      * at each host the number of slots available at a particular time for the 
        parallel job is determined as the minimum of the slots available 
        due to resource availability on a host at one hand and the slots
        available on all eligable queues together(!) for the parallel job
        (parallel_tag_hosts_queues)
       
      * the number of slots available for a parallel job at a particular time
        in a resource container is determined by ensuring various constraints
        are met and then determining the number of slots available due to 
        resource requests and resource availability at the particular time
        (parallel_queue_slots(), parallel_host_slots(), parallel_global_slots(),
        parallel_available_slots())

      * the number of slots available for a parallel job at a particular time
        in a resource container is determined as the minimum of the slots 
        available for all resources requested by the job and limited
        in the resource container (rc_slots_by_time())

      * the number of slots available with a resource can be zero for static 
        resources or is determined based on maximum utilization within the 
        specific time frame, the total amount of the resource and the per
        task request of the parallel job (ri_slots_by_time())
      
      * the maximum utilization within a time frame is determined based
        on information in resource utilization diagram for the consumable 